Gallery
Phalaborwa
-
Optimisation work at the pilot plant has improved the grade of the mixed REE hydroxide from ca. 55% to ca. 78% TREO
-
Phosphogypsum sample with leach pilot plant in the background
-
Bulk phosphogypsum received from Phalaborwa for feeding into the leach process
-
Bench scale ion exchange column with resin inside
-
Ion exchange resin beads
-
CIX Pilot Plant
-
Mixed REE hydroxide with CIX pilot plant in the background
-
The first batch of a mixed rare earth hydroxide produced by the pilot plant in February 2026
-
Phosphogypsum
-
First production of mixed rare earth sulphate
-
First production of mixed rare earth sulphate
-
First production of mixed rare earth sulphate
-
First production of mixed rare earth sulphate
-
First production of mixed rare earth sulphate
-
The front end of the pilot plant at Mintek in Johannesburg
-
The front end of the pilot plant at Mintek in Johannesburg
-
Control units for the pilot plant front end
-
The front end of the pilot plant at Mintek
-
The filter press at the pilot plant front end
-
Rainbow's new CIX/CIC units under construction at K-Tech's facility in Lakeland
-
Control piping for the CIC unit being fitted
-
Construction underway of the pilot plant back end
-
Gypsum stacks at Phalaborwa
-
Existing infrastructure: stores
-
Existing infrastructure: high voltage switchyard
-
Existing infrastructure: laboratory building
Gakara
-
New excavator in action at the Gakara Project
-
New excavator in action at the Gakara Project
-
Mechanical mining at Murambi
-
New excavator recently acquired to increase production
-
Pilot plant at Gakara Project, Burundi
-
Simple gravity separation to produce rare earth concentrate
-
Pilot plant capable of producing ~200t/month of concentrate
-
Aerial view of Gakara